Calendar off a day - ELK Products

Calendar off a day

M1 Support Forum Calendar off a day

Viewing 4 posts - 1 through 4 (of 4 total)
  • Author
    Posts
  • #10267
    Keith Belt

      We were having some trouble with one of the zones and having difficulty arming our M1 system.  Connected with the RP2 programmer to get better status info, when we noticed something odd about the account log — all the day\dates were off by one.  The log listed activity as:

      Wed 5/26/26 (today is *Tuesday*)

      and all the other entries were off a day back at least a week, to Wed 5/19/26 (5/19 was again a Tuesday).   I can only see back a week as I’m working from a screen-capture.

      Anyone else ever see this before?  What would cause this?

      #10269
      Brad Weeks

        While connected with ElkRP2 click the Send/Rcv Icon, Set Date/Time from PC and make sure the time is correct.

        #10270
        Keith Belt

          We will at the first opportunity, I know how to set the time, but I’m curious.  This wasn’t just an incorrect date entry.  Somehow the day got *misaligned* from the date.  It’s got today’s date 5/26, but today is Tuesday, not Wednesday.  How can it misalign the day from the date?

          #10271
          Brad Weeks

            From keypad programming Menu 8 – System Settings, 81- Set System Clock in 24 hr Format the Day of the Week and the Time of Day are two separate fields so it could be possible to set the Day of the Week incorrectly but have the time correct. If connected with ElKRP2 after setting the Date and Time click Automation, Sunrise/Sunset , select a City Near You, Set the Time Zone, Click Calculate (very important) and then Send To Control.

          Viewing 4 posts - 1 through 4 (of 4 total)
          • You must be logged in to reply to this topic.
          Scroll to Top